Sometimes a building owner or occupier may wish to use the building for a purpose contrary to the approved use or classification of the building detailed on the current occupancy permit. The Building Act sets out the process for obtaining approval for either a change of classification or a change...
A guide to the building approvals process in WA
The Building Act contains certain provisions requiring prescribed information to be provided to the Fire and Emergency Services (FES) Commissioner. Building surveyor requirements (r. 18B) For certain Class 2 to Class 9 buildings, the building surveyor responsible for signing the certificate of...
A guide to the building approvals process in WA
The Building Act requires the responsible person (i.e. builder or demolition contractor) to provide certain notices for the completion or suspension of work under a building or demolition permit. Notice of cessation (s. 34) The person named as the builder or demolition contractor on a building or...
A guide to the building approvals process in WA
As part of its enforcement role, a permit authority can inspect building work and investigate Building Act compliance matters and, where relevant, issue infringement notices, building orders or commence prosecution for non-compliance. There are three types of permit authority: Local government For...
A guide to the building approvals process in WA
In Western Australia, building work is required to comply with the performance requirements of the Building Code of Australia (the Building Code), which comprises Volumes One and Two of the National Construction Code Series. The Building Code contains specific bush fire construction requirements...
Building in bush fire prone areas
Types of permits and their processes One: Building permit Two: Occupancy permit Three: Building approval certificate Four: Occupancy permit strata Five: Building approval certificate strata Six: Demolition permit One Building permit
page24.jpg
page24.jpg, by ebleakley
In general a building permit...
A guide to the building approvals process in WA
General sequence chart
Building approvals process page 22
Building approvals process page 22, by ebleakley
Building approvals process page 22 Note: for uncertified applications, the certificate of design compliance is obtained by the relevant permit authority after the application is submitted. Typical building approval sequence – Class 1 and...
A guide to the building approvals process in WA
The Building Act adopts the Building Code of Australia (BCA), being Volumes One and Two of the National Construction Code series, as the primary applicable building standard for all new building work, new buildings and incidental structures. The applicable building standards apply whether or not a...
A guide to the building approvals process in WA
A certificate of compliance is required before a building permit, occupancy permit or building approval certificate can be granted by a permit authority. There are two signatures on a certificate of compliance: the signature of the building surveying practitioner registered under the Registration...
A guide to the building approvals process in WA
Coverage The Building Act 2011 (the Building Act) applies to buildings and structures attached to or incidental to a building. What is a building? There is no formal definition of a building in the Building Act; it takes its normal meaning, such as in a dictionary or in normal conversation. In the...
A guide to the building approvals process in WA

Pages

Publications

This document provides essential information to assist you with your Work Health and Safety Excellence Awards submission. Further information 2024 Work Health and Safety Excellence Awards: Terms and...
WorkSafe
Information
28 Feb 2024
This schedule lists the dates when building related legislation administered by Building and Energy is scheduled to be reviewed and the current status of those reviews
Building and Energy
Fact sheet
12 Feb 2021
The Digital DMIRS Strategy seeks to improve the department’s operations and service delivery through the effective use of technology. Some goals of the strategy are to modernise digital systems and...
Corporate
Information
23 Dec 2020
As part of its risk-based audit program, the Department of Energy, Mines, Industry Regulation and Safety – Building and Energy Division (Building and Energy) conducts general inspections to assess...
Building and Energy
Reports
04 Dec 2023
This Consultation Regulatory Impact Statement is part of the first steps towards meeting the McGowan Government’s commitment to implement Recommendations 1, 2 and 6 of the report Building Confidence...
Building and Energy
Discussion paper
27 Oct 2020
The Amendment Regulations amend regulation 31A of the Building Regulations 2012 to simplify its transitional provisions by reducing the number of adoption dates for different editions of the Building...
Building and Energy
Bulletin
27 Oct 2020
An audit of combustible cladding on high-rise, high-risk private and public buildings.
Building and Energy
Reports
16 Sep 2020
Use this form to replace a licence, registration or accreditation document.
WorkSafe
Form – application
12 Apr 2023
Welcome to the third issue of the 'Building Focus' newsletter. Building Focus brings you the latest news for the building, building surveying and painting industries.
Building and Energy
Newsletter
24 Jul 2020

Pages

Announcements

The Building Services Board has cautioned a local government building surveyor for failing to ensure that adequate information was included in the certification of work at a Bicton property. The Board found that Modesto Giancaspro (BSP190) was negligent or incompetent while carrying out building surveying work when he signed a certificate of building compliance (CBC) issued by the City of...
Building and Energy
Media release
22 Mar 2021
The Building Services Board has fined a building surveyor $1,000 for misleading the Shire of Toodyay by knowingly signing a certificate with the wrong building classification. Daniel Ross Smee (BSP293) provided a certificate of building compliance (CBC) in March 2019 for additions and alterations to a Julimar property, including a bedroom, games room and sunroom. The Board was told that Mr Smee’s...
Building and Energy
Media release
18 Feb 2021
Building and Energy and Consumer Protection have joined forces to warn parents and retailers about the risks and rules when using and selling portable pools this summer. Building and Energy oversees WA’s swimming pool safety barrier standards, which are enforced by local governments, while Consumer Protection regulates product safety. On average, one child a year drowns in a portable pool in...
Building and Energy / Consumer Protection
Media release
21 Dec 2020
WA’s building regulator is seeking public comment on proposals to review registration requirements for building practitioners and contractors. The consultation is part of Building and Energy’s broad review of the compliance and enforcement framework for the WA building industry. The main aim of the initiatives is to improve confidence in the building sector and respond to a major national report...
Building and Energy
Media release
26 Nov 2020
The supervisor of a house construction in Shelley has been fined $5,000 after several areas, including the roof and ceiling, failed to comply with approved plans or building standards. The Building Services Board found that Christopher John Joseph Brereton (BP102223) breached WA’s building registration laws by failing to properly manage and supervise a building service. Mr Brereton was a co-...
Building and Energy
Media release
12 Nov 2020
South Perth building company Jaxon Construction Pty Ltd (BC12208) has been fined $5,000 for negligence after carrying out unauthorised building works that deviated from the approved plans for a Perth hotel development. The Building Services Board also issued a $2,500 fine to the builder’s nominated supervisor, Christopher Christou (BP/BC6285), for failing to properly manage and supervise the...
Building and Energy
Media release
10 Nov 2020
A Bridgetown builder has been formally cautioned for negligent conduct after he carried out work without a building permit. The Building Services Board found Matthew Dean Jansen (BC101487, BP101779) breached WA’s building registration laws during a home construction project in Bridgetown, which he took over in April 2019 after the original builder went into liquidation. Mr Jansen started work at...
Building and Energy
Media release
06 Aug 2020
The Building Services Board has issued a formal caution to a Mullaloo builder after his partner’s business entered into a contract to do a $300,000 commercial fit-out, but the registration and building approval documents were issued to him as an individual building contractor. In 2018, the City of Joondalup received a building permit application and a notice of completion that identified Dwayne...
Building and Energy
Media release
06 Aug 2020
On 1 July 2020, NCC 2019 Amendment 1 was adopted. Note (as below): Western Australia has transitional provisions in place for the adoption of the Building Code of Australia (BCA) which is Volumes One and Two of the National Construction Code (NCC). Key changes A new provision, A2.2(4), in the Governing Requirements to require (from 1 July 2021) that a process be followed when creating and...
Building and Energy
Department News
13 Jul 2020
The objective of energy efficiency provisions in the Building Code of Australia (BCA) is to reduce greenhouse gas emissions, and for a dwelling, this requires compliance with the minimum energy efficiency Performance Requirements that relate to the building envelope and its fixed domestic services. When applying these provisions for residential dwellings, building surveyors, designers and...